Lower deck of Centre Street Bridge in Calgary to close until summer

With ongoing construction, the City of Calgary will close the lower section of the Centre Street Bridge starting Feb. 28 for several months as that part of the 106-year-old structure is rebuilt.

The city says it’s spending $1.5 million to upgrade the lower deck to allow a safe and efficient crossing for vehicles, pedestrians, and cyclists.

 

The investment will replace the existing rail structure to be heightened and screens will be installed underneath the bridge.

The span will close on Feb. 28 and will remain in place until June 2022.

The Centre Street Bridge crosses the Bow River along Centre Street and was originally built in 1916.

Centre Street Bridge

The lower deck of the Centre Street Bridge (Courtesy: City of Calgary)

For additional updates visit the City of Calgary website to learn more.

Top Stories

Top Stories

Most Watched Today